JOB: Remove rotted siding and repair the retaining wall which was the cause of the rot. The bricks need to be removed from the back patio, drainage rock and pipe installed, and then reinstall bricks to make it level.
Beginning to remove the siding, install the drainage rock and pipe and build the retaining wall
Showing posts with label patio. Show all posts
Showing posts with label patio. Show all posts
Wednesday, June 2, 2010
Subscribe to:
Posts (Atom)
